鋼筋加工棚是如何搭建的?
來源:http://www.litoele.com/ 發(fā)布時間:2021-09-30
鋼筋作為建筑施工的主要材料,大多數(shù)需要在施工現(xiàn)場進行加工操作,操作人員在施工現(xiàn)場的工作時間也相對較長,為了改善操作環(huán)境,鋼筋加工棚應(yīng)運而生。鋼筋加工棚是施工現(xiàn)場內(nèi)對鋼筋進行拉直、彎曲、焊接等鋼筋加工作業(yè)的場地。
As the main material of building construction, most of the reinforcement needs to be processed on the construction site, and the operators have a relatively long working time on the construction site. In order to improve the operating environment, the reinforcement processing shed came into being. The reinforcement processing shed is the site for straightening, bending, welding and other reinforcement processing operations on the construction site.
現(xiàn)場鋼筋加工棚一般需根據(jù)施工組織計劃,安置鋼筋對焊機、切斷機、彎曲機、調(diào)直機等設(shè)備的數(shù)量及加工流水線;另還需考慮部分鋼筋原材料、加工后鋼筋的周轉(zhuǎn)及堆放;現(xiàn)場施工場地、用電等條件來確定。
The on-site reinforcement processing shed generally needs to place the number of reinforcement butt welding machines, cutting machines, bending machines, straightening machines and other equipment and processing lines according to the construction organization plan; In addition, the turnover and stacking of some reinforcement raw materials and processed reinforcement shall be considered; Site construction site, power consumption and other conditions.
哪些場所必須搭建加工棚
Which places must build processing sheds
1.施工現(xiàn)場所有鋼筋加工場均需設(shè)置加工棚,
1. All reinforcement processing yards on the construction site shall be provided with processing sheds,
2.所有露天放置的施工設(shè)備均應(yīng)搭設(shè)防護棚,如木工加工、小型機械、攪拌機、砂漿機等。
2. All construction equipment placed in the open air shall be provided with safety protection sheds, such as woodworking, small machinery, mixer, mortar machine, etc.
3.在建筑物墜落半徑內(nèi)或塔吊覆蓋范圍內(nèi)的加工棚需要設(shè)置雙層硬質(zhì)防護。
3. The processing shed within the falling radius of the building or within the coverage of the tower crane needs to be provided with double-layer hard protection.
鋼筋加工棚搭建要求
Construction requirements of reinforcement processing shed
1.工具式鋼筋加工棚搭設(shè)具體尺寸根據(jù)現(xiàn)場實際情況確定。
1. The specific size of tool type reinforcement processing shed shall be determined according to the actual situation on site.
2.搭設(shè)在塔吊回轉(zhuǎn)半徑和建筑物周邊的加工車間必須設(shè)置雙層硬質(zhì)防護。
2. The processing workshop set up around the slewing radius of the tower crane and the building must be provided with double-layer hard protection.
3.加工區(qū)地面需硬化,宜選用混凝土地面。
3. The ground of the processing area needs to be hardened, and the concrete ground should be selected.
4.加工區(qū)頂部應(yīng)張掛警示標識和宣傳用語的橫幅,橫幅寬度宜為1米。
4. Safety warning signs and banners of safety propaganda words shall be hung on the top of the processing area, and the width of the banner should be 1m.
5.工具式鋼筋加工棚需在醒目處掛操作規(guī)程圖牌,圖牌的尺寸為:寬×高=2m×1mm。
5. The tool type reinforcement processing shed shall hang the operation specification drawing board at an eye-catching place, and the size of the drawing board is: width × Height = 2m × 1mm。
6.各種型材及構(gòu)配件規(guī)格為參考值,具體規(guī)格應(yīng)根據(jù)當?shù)仫L(fēng)荷載、雪荷載進行核算。
6. The specifications of various profiles and components and fittings are reference values, and the specific specifications shall be calculated according to the local wind load and snow load.
7.南方地區(qū),如遇臺風(fēng)應(yīng)采取防風(fēng)措施,可設(shè)置纜風(fēng)繩。
7. In case of typhoon in southern China, windproof measures shall be taken, and wind ropes can be set.
- 上一篇:焊工加工棚安裝
- 下一篇:哪些情況下會用到臨時簡易圍擋?